"How much is the car?" is the last number a fleet buyer should look at. The number that matters is the landed cost — everything it takes to move a vehicle from a factory gate in China to a registered, insured asset in your fleet. Here is how that number is built, where the differences hide, and why two quotes for the same car can legitimately differ.

The five building blocks

1. The vehicle price. Buying direct removes the European dealer margin — that is the whole point. The price is quoted per model, specification and quantity, and it is the one component that genuinely improves with volume.

2. International freight. Sea freight on a regular sailing, either container (3–4 cars per 40-ft box) or RoRo. This is a per-car figure that moves with shipping markets and with the destination port — Koper, Hamburg and Gdańsk price differently, and inland transport to your door is a separate line.

3. Customs duty. Public regulation, identical for every importer. Passenger cars enter the EU at 10% of the customs value. Vehicles meeting the used-vehicle definition — over 6,000 km and first registered more than six months ago — pay that same 10%, while new Chinese-built electric cars currently carry additional countervailing duties on top. The duty is calculated on the CIF value (price + freight + insurance), not on the vehicle price alone.

4. Certification. The cost of the legal path into your market. For a WVTA vehicle with a COC it is effectively zero — the paperwork exists. An Individual Vehicle Approval is a real, per-car cost, which is why it appears as a line in your quote rather than a surprise at the border.

5. Clearance, delivery, VAT. Port handling and customs clearance are modest fixed costs per shipment. VAT at your national rate applies at import — for VAT-registered businesses it is normally recoverable, so it is a cash-flow item, not a cost. It still needs to be planned.

An illustrative example

The figures below are illustrative only — an anatomy of a landed cost, not a quotation. Actual numbers depend on model, quantity, port and timing, and are stated in your actual quote.

ComponentIllustrative figureNotes
Vehicle (FCA China)€20,000Per unit, model-dependent
Sea freight + insurance€1,500Container share, North-European port
Import duty, 10% of CIF≈ €2,150(20,000 + 1,500) × 10%
Certification path€0 – quoted per carCOC included; IVA is a per-car line
Clearance + port handling€300Per shipment, shared across cars
Landed, ex-VAT≈ €23,950Before recoverable VAT

Two things are worth noticing in the anatomy. First, duty is charged on the CIF value, so freight is not just a logistics line — it also raises the duty base. Second, the components that vary by buyer — quantity, port, certification path, inland delivery — are exactly the components a quote is built from. That is why a serious supplier will not give you a number before you give them a destination.

Where quotes legitimately differ

When two offers for the same model differ, the difference is almost always in one of four places: the specification (domestic vs export version — hardware, not paperwork), the certification path included, the delivery terms (FCA versus DAP shifts freight, clearance and risk), and the stock position (a car in stock versus a car to be produced). Comparing quotes line by line against these four is more useful than comparing bottom lines.

Before your first order

Ask three questions of any supplier, us included: Which specification is the vehicle — domestic or export version? Which certification path is included in the price, and which is extra? And at which point in the chain does the vehicle become my risk? A quote that answers all three in writing is a quote you can compare. One that does not is just a number.